Cullen-Peck Famly  Rook Construction Sep 07 - Apr 09

Photo Gallery

Site Prep / Footings / Steel and ICF Photos  —  Taken from 09/14/06 to 11/17/06 at Sharp Top

Text Box: Site Prep 1

Site Grading Begins

Text Box: Site Prep 2
Text Box: Footings 1

Plumbing for Slab and Footing Forms

Text Box: Footings 2

Rebar Placed in Footings

Text Box: Footings 3

Concrete Poured into Footings

 

Text Box: Footings 4

ICF Rebar Inserted and Smoothing

 

Text Box: Steel 1

Steel Supporting Kiltie Bolts Placed

Text Box: Steel 2
Text Box: Steel 3

Manifold Beam Detail

Text Box: ICF Delivery 1

Unloading the Truck

Text Box: ICF Delivery 2
Text Box: ICF Delivery 3

Page 1 — Site Prep (Sept—Nov 06)

Date: 12/07/06

Block and Materials Placed by Site

Text Box: Initial Steel Frame Up

Septic Tank Installed

Steel and ICF Ready