Cullen-Peck Famly Rook Construction Sep 07 - Apr 09 |
|
Photo Gallery |
|
Site Prep / Footings / Steel and ICF Photos — Taken from 09/14/06 to 11/17/06 at Sharp Top |
|
Site Grading Begins |
|
Plumbing for Slab and Footing Forms |
|
Rebar Placed in Footings |
|
Concrete Poured into Footings
|
|
ICF Rebar Inserted and Smoothing
|
|
Steel Supporting Kiltie Bolts Placed |
|
Manifold Beam Detail |
|
Unloading the Truck |
Page 1 — Site Prep (Sept—Nov 06) |
Date: 12/07/06 |






|
Block and Materials Placed by Site |


|
Septic Tank Installed |

|
Steel and ICF Ready |