
|
Cullen-Peck Famly Rook Construction Sep 07 - Apr 09 |

|
Photo Gallery |
|
Observatory Construction Photos — Taken from 1/15/08 to 5/12/08 (Also see Ron’s pix @ http://www.pbase.com/hophead/20080504cullenpeck&page=all) |
Page 10 — Observatory Construction (Jan 08-May 08) |
Date: 5/16/08 |
|
Roof Timbers Attached |

|
Leveling Joists and Hurricane Ties |


|
Platform Framing Complete |


|
Dome Crate Arrives |


|
Fiberglass and Paint |


|
Crate Unloaded and Stored |


|
Base Ring Assembly |


|
Base Ring Complete |


|
Dome Parts Hoisted Up To Roof |


|
Quadrants Assembled On Parapet |


|
Dome Halves on Base Ring |


|
Shutters On and Manually Checked |
