Cullen-Peck Famly  Rook Construction Sep 07 - Apr 09

Photo Gallery

Observatory Construction Photos  —  Taken from 1/15/08 to 5/12/08

 (Also see Ron’s pix @ http://www.pbase.com/hophead/20080504cullenpeck&page=all)

Text Box: Platform 1

Page 10 — Observatory Construction (Jan 08-May 08)

Date: 5/16/08

Roof Timbers Attached

Text Box: Platform 2

Leveling Joists and Hurricane Ties

Text Box: Platform 3

Platform Framing Complete

Text Box: Crate 1

Dome Crate Arrives

Text Box: Platform 4

Fiberglass

and Paint

Text Box: Crate 2

Crate Unloaded

and Stored

Text Box: Base Ring 1

Base Ring

Assembly

Text Box: Base Ring 2

Base Ring

Complete

Text Box: Dome 1

Dome Parts Hoisted Up To Roof

Text Box: Dome 2

Quadrants Assembled

On Parapet

Text Box: Dome 3

Dome Halves

on Base Ring

Text Box: Dome 4

Shutters On and Manually Checked