
|
Cullen-Peck Famly Rook Construction Sep 07 - Apr 09 |

|
Photo Gallery |
|
ICF, Truss and Framing Photos — Taken from 2/01/07 to 2/10/07 at Sharp Top |
|
Beams and Trusses in Basement Placed |
|
2nd Floor Built with Window Bucks and ICF |
|
2nd Floor Block Placement Completed |
|
2nd Floor ICF Braced From Inside |
|
Cold Weather Concrete Pouring |
|
Engineer Clint Inspects the ICF |
Page 3 — Top 2 Floors (Feb 07) |
Date: 2/03/07 |







|
Trusses Supported by Partition Framing |








|
Top Floor hangers and joists attached |
|
Manifold beam supporting subfloor |
|
View Outside From 2nd Floor |






