Cullen-Peck Famly  Rook Construction Sep 07 - Apr 09

Photo Gallery

ICF, Truss and Framing Photos  —  Taken from 2/01/07 to 2/10/07 at Sharp Top

Text Box: Basement Framing 1

Beams and Trusses in Basement Placed

Text Box: Basement Framing 2
Text Box: 2nd Floor ICF 1

2nd Floor Built with Window Bucks and ICF

Text Box: 2nd Floor ICF 2

2nd Floor Block Placement Completed

Text Box: 2nd Floor Braced

2nd Floor ICF Braced From Inside

Text Box: 2nd Floor Concrete

Cold Weather Concrete Pouring

Text Box: Engineer Visits

Engineer Clint Inspects the ICF

Text Box: ICF Completed

Page 3 — Top 2 Floors (Feb 07)

Date: 2/03/07

Text Box: ICF blocks completed and ready to pour

Trusses Supported by Partition Framing

Text Box: Top Floor Hangers

Top Floor hangers and joists attached

Text Box: Top Floor Support

Manifold beam supporting subfloor

Text Box: 2nd Floor Interior

View Outside From 2nd Floor

Text Box: Top Floor View
Text Box: View of Lake Through Doorway to Roof